Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Los Angeles
Adding a room, converting a garage, or building an ADU in Los Angeles means building inside one of the most layered code environments in the country. We know these Westside blocks well enough to check jurisdiction by parcel before a single line gets drawn, and we plan every opening of an older home around what that inspection is likely to find. Call (844) 560-5501 to schedule your free estimate, and we’ll walk the lot with you before we quote it.
Why Los Angeles Homeowners Call Construction Torrance for Home Additions & ADU
Los Angeles rewards planning and punishes assumptions. That’s why we start with the parcel, not the plan set: the City of LA, the unincorporated county pockets tucked between neighborhoods, and the Santa Monica-adjacent rules each carry their own permitting, inspection, and seismic requirements. Our technicians have up to 13 years of experience, and our work is licensed and insured. You get a free estimate backed by a written, line-item quote, and we pull the permits and see them through inspection.
Response time to Los Angeles is one reason homeowners call us first. We answer 24/7, with fast dispatch from 7am to 7pm, Sunday through Friday, and the crews who arrive know the difference between a 1920s Spanish Colonial and a 1960s dingbat on sight. That matters, because the older the house, the more likely the surprises hide behind the stucco. We’d rather find them during a pre-inspection than after the walls are closed. It keeps your budget honest and your schedule real.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Los Angeles
ADU Design & Permitting
We handle the drawings, the permit submittal, and the back-and-forth with the building department from the start. For Los Angeles properties, that means confirming first whether the parcel falls under City of LA or a county island, because the setback and seismic requirements can differ within a few blocks. We also work with prefab ADU systems from Abodu and Dvele where speed to occupancy matters more than a fully custom build.

Garage Conversion ADU
A garage conversion is usually the fastest path to a rentable unit, and a typical garage conversion ADU in Los Angeles runs $35,400 – $94,400. What drives the number is what’s beneath the slab: old clay sewer laterals and undersized framing show up often in this housing stock. We inspect before we quote, so the conversion price reflects the real condition of the structure.

New Detached ADU
A new detached ADU gives you the most design freedom and the cleanest separation from the main house. On tight Westside lots, site drainage and slope planning come first, then framing, utilities, and tie-downs to seismic spec. A full ADU construction project in Los Angeles typically runs $106,200 – $259,600, and the written estimate sets the final price.

Second Story Additions
A second-story addition is where Los Angeles’s soft-story retrofit rules most often come into play, and it’s the addition type most likely to trigger a structural review before framing. We bring a structural engineer and an electrician in early, so the load path and the wiring plan are settled before anyone cuts a wall. That ordering keeps the permit moving and the surprises priced, not improvised.
Trusted Brands We Service in Los Angeles
Material choices on an addition or ADU shouldn’t be an afterthought. We’re authorized to work with 50+ brand-name manufacturers across every trade, and on ADU work we draw on prefab systems including Abodu, Cover, and Dvele when the project calls for a modular approach. That means real choices, not whatever’s cheapest on the shelf. We don’t stock parts or run a warehouse; we source to your project spec and coordinate delivery so it lands when the schedule needs it. You get the brands you researched, specified to manufacturer standards, and a single point of contact to answer for them.
Common Home Additions & ADU Problems We See in Los Angeles Homes
- Assuming the ZIP code decides the permit. Jurisdiction here is parcel-specific, not ZIP-based. Identical plans a few blocks apart can need two different permit sets, so we verify before drawing anything.
- Budgeting without allowances for latent repairs. Knob-and-tube wiring and clay sewer laterals are common in 1920s – 40s housing. We write allowances into the contract so a mid-project discovery doesn’t blow up the budget.
- Skipping a pre-inspection of existing framing and waterproofing. Failed stucco waterproofing and undersized load-bearing walls get expensive once the rough-in is done and the walls are closed. We check first.
- Ignoring seismic and fire-watch realities. This is earthquake-active, wildfire-prone ground, and the dry Santa Ana wind season compresses exterior finishing schedules. Tie-downs, soft-story retrofits, and wildfire-resistant materials get planned in, not added later.
Pricing for Home Additions & ADU in Los Angeles, CA
Here’s what these projects typically run in Los Angeles, stated plainly so you can budget before you call. These are estimates; the written estimate sets the final price, and it’s line-item and fixed.
| Service | Typical estimated range |
|---|---|
| Home Addition | $53,100 – $153,400 |
| ADU Construction | $106,200 – $259,600 |
| Garage Conversion | $35,400 – $94,400 |
Cost moves with foundation work, latent repairs discovered during inspection, and how much of the existing structure needs upgrading to current code. The permit itself can differ by parcel. Because the written estimate is where the number gets locked, we price the inspection findings and any expected change orders into the contract up front. Estimates are free.
See the difference
Before
After
Before
After
Before
AfterOur Inspection-First Approach to Opening Older Los Angeles Walls
Open a wall in a 1920s Spanish Colonial bungalow and you tend to find the same things: knob-and-tube wiring spliced into newer romex, 2×4 framing that was never rated to carry a load, and subfloor rot from decades of failed stucco waterproofing. Before anyone frames the addition, a qualified local general contractor brings a structural engineer and an electrician in, writes allowances for latent repairs into the contract, and prices any change order in writing before proceeding. On the Westside, the same job can also trigger a soft-story retrofit if you add a story, and the contractor has to confirm whether the parcel sits in City of LA or an unincorporated county island, because the permit set and the inspection sign-off differ.
This is the single biggest reason a remodel quote moves, and it’s why we handle inspection first. Where the Westside’s boundaries are parcel-specific rather than ZIP-based, identical ADU plans a few blocks apart can require two different permit sets and inspection regimes. Build a lot that straddles those lines, and the same plan needs two permit sets within a few blocks. We check jurisdiction by parcel before drawing a line, and any surprise gets priced and approved in writing before we touch it.
We Also Serve Cities Near Los Angeles
The same code-and-typology navigation applies across the surrounding cities. Through our home additions & ADU team, we work with homeowners in West Hollywood, Culver City, Beverly Hills, and Lennox. If you’re just outside the LA line, call and we’ll confirm your jurisdiction and what it means for your project before you spend anything on drawings.
Serving Los Angeles, CA – Our Local Coverage Area
We serve Los Angeles and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Los Angeles
Because jurisdiction here is set by parcel, not by ZIP code. A lot can sit in the City of LA with an unincorporated county sliver next door, and each has its own permitting, inspection, and seismic requirements. That’s why we verify whether your parcel is City of LA or a county island before drawing. Call (844) 560-5501 for a free estimate and we’ll confirm your jurisdiction first.
Expect knob-and-tube wiring spliced into newer romex, undersized 2×4 framing never rated to carry a load, and subfloor rot from failed stucco waterproofing. None of that is unusual in this housing stock; finding it early is the point of our pre-inspection. We write allowances for those repairs into the contract so they don’t arrive as a surprise. Call (844) 560-5501 to schedule your free estimate.
Allowances are budgeted up front for repairs we can reasonably expect to find, and a change order is any actual repair priced and approved in writing before we proceed. You aren’t handed a mid-project surprise bill; you approve every change before it happens. The written line-item estimate sets the final price. Call (844) 560-5501 for an exact quote – estimates are free.
It can, and a second-story addition is the case where it most often applies, so we confirm structural and seismic requirements before framing. We bring a structural engineer and an electrician in early rather than discovering the need after the rough-in. That ordering is how the permit set stays on track. Call (844) 560-5501 and we’ll walk your lot and the plans with you.
A garage conversion reuses the existing structure and footprint, so it usually moves through permitting faster, while a new detached ADU is a ground-up build with its own foundation, utilities, and site planning. In this market a typical garage conversion runs $35,400 – $94,400 and a new detached ADU runs $106,200 – $259,600. Which fits comes down to your lot and your goals. Call (844) 560-5501 to schedule your free estimate.
Get Your Los Angeles Addition or ADU Priced
Whether you’re adding a second story, converting a garage, or building a detached ADU, the first step is the same: an inspection, a jurisdiction check by parcel, and a written estimate that accounts for what older Los Angeles homes really hold. Work is licensed and insured, we pull the permits and pass inspections, and any change is priced in writing before we touch it. Call (844) 560-5501 for a free estimate. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Written by the team at Construction Torrance.